Home Repair Decoded

Building Permit Fees by City: Published Examples

Short answerPermit fees vary widely and are often based on job value or size. This table lists examples exactly as each city publishes them, with the source and date where stated. Fees change, so confirm the current amount with your building department.
CityJobFee as publishedDateSource
AtlantaBuilding permit$7 per $1,000 of cost of construction, $150 minimum—Source
AtlantaMechanical permitBase fee $150, minimum fee amount $175—Source
AtlantaElectrical permitBase fee $150, minimum fee amount $75—Source
AtlantaPlumbing permitBase fee $150, minimum fee amount $175—Source
AtlantaRemove and replace hot water tank, one- and two-family residence, online permit$50 each—Source
BaltimoreAlterations and repairs, 1- and 2-family dwellings$0.30 per square foot or fraction of a square foot of affected gross floor area, minimum $50; exterior-only alterations and interior door installation: $10 for each $1,000 or fraction of $1,000 estimated cost, minimum $50Building, Fire, and Related Codes, 2024 EditionSource
BaltimoreInstall, replace or reconstruct a plumbing fixture$5 eachBuilding, Fire, and Related Codes, 2024 EditionSource
BaltimoreNew electrical branch circuit$6 per circuitBuilding, Fire, and Related Codes, 2024 EditionSource
BaltimoreElectrical service wiring, 0 to 100 amps$25Building, Fire, and Related Codes, 2024 EditionSource
BostonShort form building permit$20.00 primary fee plus $10.00 per $1,000 of the estimated cost of workFile dated May 15, 2023Source
BostonLong form building permit$50.00 primary fee plus $10.00 per $1,000.00 of the estimated cost of workFile dated May 15, 2023Source
BostonPlumbing permit$20.00 primary fee plus $5.00 each fixtureFile dated May 15, 2023Source
BostonGas permit$20.00 primary fee plus $5.00 per applianceFile dated May 15, 2023Source
BostonElectrical permit, no change in service$20.00 application fee plus $1.00 each fixture, plug or outletFile dated May 15, 2023Source
DallasMinimum inspection fee, 1 trade$125Effective July 1, 2025Source
DallasMinimum inspection fee, 2 trades$250Effective July 1, 2025Source
DallasResidential plan review$0.046 per sq.ft. or $577 (whichever is greater)Effective July 1, 2025Source
DallasDocument handling, residential one- and two-family dwellings$25Effective July 1, 2025Source
DallasResidential plans check addendum$100 per trade added or substitutedEffective July 1, 2025Source
DenverSolar photovoltaic project$50 flat fee per permit; plan review fee $0Policy revision date May 21, 2024; fees adjust every July 1Source
DetroitNew buildings, alterations, repairs and additions, project cost of $2,000 or lessFlat $271.43Effective January 1, 2024Source
DetroitElectrical circuit, new or extended, altered or removed$20 eachEffective January 1, 2024Source
DetroitElectrical rough inspection, single-family or two-family dwelling$59 eachEffective January 1, 2024Source
MiamiBuilding, plumbing, mechanical and electrical, residential up to 3 units0.50% of estimated construction costsResolution R-26-0200, adopted April 23, 2026Source
MiamiResidential work estimated at less than $2,500.00$45.00Resolution R-26-0200, adopted April 23, 2026Source
MiamiSolid waste residential surcharge$0.22 per $100.00 of estimated cost of construction, minimum $26.00, maximum $600.00Resolution R-26-0200, adopted April 23, 2026Source
MiamiWork without a permit, homestead propertyWork without a permit (after the fact): base fee plus $110.00; homestead property (residential) 2x base feeResolution R-26-0200, adopted April 23, 2026Source
MinneapolisPlan review on a building permit65% (0.65) x the building permit fee; no plan review fee for simple permitsVersion 6.1.2019Source
New YorkAlteration filed with an Alt-CO job in a 1-, 2- or 3-family house$170 minimum for the first $5,000 of estimated job cost, plus $2.60 per each $1,000 over $5,000DOB NOW: Build Winter 2026 Release, updated January 2026Source
OrlandoBuilding permit, residential 1 or 2 units$64.94 for the first $1,000 of construction cost or fraction thereof, plus $4.32 for each additional $1,000 or fraction thereofEffective January 2023Source
OrlandoElectrical permit$63.67 for the first $1,000 of construction cost or fraction thereof, plus $10.60 for each additional $1,000 of construction cost or fraction thereof up to and including 25,000, plus $7.96 for each additional $1,000 of construction cost or fraction thereof greater than $25,000Effective January 2023Source
OrlandoChange of electrical service$60Effective January 2023Source
OrlandoAdministrative Inspection Fund surcharge1.5% of permit fee ($2 minimum)Effective January 2023Source
PhiladelphiaAlterations, residential (1 or 2 family), includes EZ permit$76 for the first 500 sq. ft.; plus $56 for each additional 100 sq. ft. over 500Effective January 1, 2025 (Rev. 2.2026)Source
PhiladelphiaElectrical work$25 for each $1,000 or fraction thereof of estimated electrical construction costs (minimum $63 / maximum $18,975)Effective January 1, 2025 (Rev. 2.2026)Source
PhiladelphiaPlumbing, additions, residential (1 or 2 family)$50 for first 7 fixtures associated with additions; $22.50 for each additional fixture above 7Effective January 1, 2025 (Rev. 2.2026)Source
PhoenixResidential water heaters and fences, project valuation $1 to $1,000$98 minimumApproved 12/17/2025, Ordinance G-7465, effective 1/20/2026Source
PhoenixProject valuation $1 to $1,000$195 base fee onlyApproved 12/17/2025, Ordinance G-7465, effective 1/20/2026Source
PhoenixProject valuation $1,001 to $10,000$195 on first $1,000, plus $12 for each additional $1,000, or fraction thereof, to and including $10,000Approved 12/17/2025, Ordinance G-7465, effective 1/20/2026Source
PortlandBuilding permit, valuation $1 to $500$167.00 minimum feeEffective July 10, 2026Source
PortlandBuilding permit, valuation $501 to $2,000$167.00 for the first $500, plus $3.59 for each additional $100 or fraction thereof up to and including $2,000Effective July 10, 2026Source
RiversideWater heater, up to 100,000 BTU$37.00FY 2026/27, as of July 1, 2026Source
RiversideResidential re-roof, overlay$103.00 for the first 1,000 s.f., add $25 each 500 s.f. thereafterFY 2026/27, as of July 1, 2026Source
RiversideResidential re-roof, tear off and re-roof$123.00 for the first 1,000 s.f., add $25 each 500 s.f. thereafterFY 2026/27, as of July 1, 2026Source
RiversidePermit issuance fee$41.00FY 2026/27, as of July 1, 2026Source
RiversideDwelling re-wirePartial $103.00; full $188.00FY 2026/27, as of July 1, 2026Source
San AntonioResidential repair, existing re-roof$28.75FY 2027 Development Fee Schedule, revised October 2026Source
San AntonioResidential repair, existing general$172.50FY 2027 Development Fee Schedule, revised October 2026Source
San AntonioResidential repair, existing full remodel$241.50FY 2027 Development Fee Schedule, revised October 2026Source
San AntonioResidential fence$28.75FY 2027 Development Fee Schedule, revised October 2026Source
San AntonioRepair existing foundation$184.00FY 2027 Development Fee Schedule, revised October 2026Source
San DiegoWater heater$122.97 eachInformation Bulletin 103, May 2026Source
San DiegoElectrical panel replace or upgrade up to 200 amps$176.57 eachInformation Bulletin 103, May 2026Source
San DiegoFurnace or FAU$176.57 first unit, $52.39 each additionalInformation Bulletin 103, May 2026Source
San DiegoCondensing unit for HVAC$131.52 eachInformation Bulletin 103, May 2026Source
SeattleMinimum permit or plan review fee for value-based fees$2922026 Fee Subtitle, effective January 1, 2026Source
SeattleElectrical permit when plans are reviewed, valuation $0 to $1,000$260 for the first $1,000 of value or fraction thereof2026 Fee Subtitle, effective January 1, 2026Source
SeattleElectrical permit when plans are reviewed, valuation $1,001 to $5,000$260 for the first $1,000 of value plus $6 for each additional $100 of value or fraction thereof2026 Fee Subtitle, effective January 1, 2026Source
SeattleElectrical permit when plans are not required, administrative fee$55.482026 Fee Subtitle, effective January 1, 2026Source
St. LouisBuilding permit, estimated cost $0 to $1,000$19 permit fee, $44 total with application fee—Source
St. LouisBuilding permit, estimated cost over $3,000$10.00 per thousand estimated construction cost or fraction thereof, plus the $25 application fee—Source
St. LouisPlumbing fixture, including a water heater$10 each, plus $30 application fee (City Ordinance 71644)—Source
St. LouisPlumbing rough or finish inspection$25 each—Source
TampaMiscellaneous project, residential, for construction activity not in another fee table$177.00Effective October 1, 2018; updated 5/31/2020Source
TampaFlorida Building Permit Surcharge2.5% of permit value or $4.00 minimum, not included in listed valuesEffective October 1, 2018; updated 5/31/2020Source
Washington, DCDeck permit (residential deck of 500 sq. ft. or less on a single- or two-family dwelling), construction cost under $500$36.30—Source
Washington, DCDeck permit, construction cost $500 to $1,000$71.50—Source
Washington, DCDeck permit, construction cost $1,001 to $1,000,000($30.00 + (2% of construction value $1,001 - $1,000,000)) + 10%; ranges between $55.02 - $22,033—Source
Washington, DCInstant permit for simple scopes on one- and two-family homesFees average $36.30 ($250 for solar permit)—Source